Process & system design
Assess the agreed workflows and define responsibilities, system architecture and implementation scope.
Connect production, inventory and costing through an ERP project built around your agreed manufacturing workflows. From process mapping and testing to training and go-live, the focus is material traceability, yield, wastage and cost visibility.
Request a ConsultationAT A GLANCE
Individually quoted project
Process mapping, reliable data, client testing and shop-floor adoption are required. Acceptance requires 30 days of successful live operation against agreed criteria.
Indicative ranges are not fixed offers. Licences, hardware, travel, specialist modules and ongoing AMC follow the signed scope and quotation.
Next step: share your requirement. We’ll contact you to discuss suitability, scope and a suitable consultation time.
Request a Consultation ↗THE PRACTICAL DETAILS
A simple guide to the service. The detailed scope below explains the full conditions.
Indicative SME projects: ₹1.5–5 lakh; complex implementations: ₹5–15 lakh or more, plus GST. These are quotation bands, not fixed offers.
Manufacturers that need production, stock and cost information to connect reliably.
A scoped implementation for agreed workflows, users, locations and reports. Software selection follows process and feasibility assessment; it is not an off-the-shelf fixed package.
Assess the agreed workflows and define responsibilities, system architecture and implementation scope.
Set up agreed item, unit, location and relevant batch masters, openings and movement rules.
Connect agreed formulas or bills of materials, material consumption, WIP, finished output and wastage.
Track standard versus actual material use, output and basic product or batch costs from approved inputs.
Define supported posting and reconciliation between operational stock and financial accounts.
Scoped configuration, client testing, training, go-live and 60-day hypercare under agreed terms.
Discuss needs and feasibility; detailed surveys and blueprints are separately scoped.
Approve the design, software, deliverables and responsibilities before implementation.
Your users test agreed scenarios, approve results and prepare for daily operation.
Run agreed live transactions and reports; acceptance and hypercare follow the signed criteria.
Additional work needs a separately agreed scope and fee where available.
Not necessarily. Existing systems may be retained and connected, or replaced, after an approved design decision and feasibility review.
No. Thirty successful live days relate to acceptance, not the total implementation timeline. Project delivery dates depend on the agreed scope.
Acceptance checks agreed live transactions, reports and material defects. Hypercare provides in-scope support for 60 days from go-live.
No. Modules, reports, interfaces and configuration depth are agreed in the scope. New requirements follow an approved change and pricing process.
Scope, deliverables, responsibilities and commercial terms.
The purpose is management visibility and disciplined recordkeeping. Installing software alone cannot guarantee yield improvement, inventory accuracy or business readiness for fundraising or listing; those outcomes depend on employee adoption, data quality and wider governance.
The following capability areas form the normal implementation foundation. Their quantity, depth, interfaces and reports are fixed in the signed project scope after the initial assessment:
Define item, unit-of-measure, location and relevant batch/lot masters, agreed opening stock and inventory-movement rules; assign responsibility for physical verification and corrections.
Map and configure a bill of materials or formulation where relevant, production or batch references, raw-material issue/consumption, work-in-progress movement, finished-output posting and wastage/rejection records.
Track standard versus actual material usage and production output at the agreed batch, item or process level. Define yield calculation by product type, accounting for differing units, intermediate products and legitimate process losses.
Configure basic product/batch cost capture from available material transactions and agreed production cost inputs. Overheads, labour and cost allocations require approved policies and trustworthy source data.
Establish reconciliations between the operational stock ledger and the financial accounts, whether accounting remains in Tally or moves to a unified ERP. Record unmatched transactions and period-end adjustments.
Provide agreed operating reports for inventory, output, consumption, yield, wastage and cost; document all limits and data dependencies.
Cosmetics may require records and traceability beyond these commercial reports. Any necessary quality, licence, lab, batch-manufacturing or statutory record controls are assessed in the project blueprint with the client's regulatory adviser; ERP configuration is not a regulatory certification.
A 30-day successful live-operation period is an acceptance requirement, not a 30-day deadline for a complex implementation. Acceptance is assessed against the agreed live transactions, reports and treatment of material defects in the signed acceptance criteria; it is not triggered merely by 30 days passing. The project schedule and business readiness prerequisites are agreed after process mapping. The remaining hypercare days continue after acceptance when acceptance occurs on day 30. Client-caused delays, missing data, new requests or third-party outages are handled under the signed exceptions/change-control process.
Appoint a project sponsor and shop-floor process owners, allocate timely user time, approve source records, perform physical stock counts and sign off reconciled opening balances and product/formula masters.
Arrange suitable devices, connectivity, licences, staff availability and data access. Operate production recording daily through client employees; optional PROFINZO staffing is separately quoted.
Make operational, cost-allocation, regulatory and accounting-policy decisions, approve testing and provide timely UAT feedback. ERP information is not independently verified or assured by PROFINZO.
Software subscriptions, implementation partner licences, cloud/server fees, hardware, customised interfaces, historic reconstruction, complete factory stocktake, third-party assurance and formal legal/regulatory certification are excluded unless stated in the project quotation.
No promise of higher yield, accurate reporting without reliable inputs, funding success, IPO eligibility, 24/7 support or unlimited customisation is made.
Each implementation is quoted against a specific work order with agreed fees, modules, facilities, integrations, data conversion, onsite visits, travel treatment, deliverable acceptance, change approvals and milestone payments. Fees and schedules change only through a documented variation. Software may be licensed directly by the client or resold through an authorised PROFINZO/vendor arrangement, with licensing responsibility and costs disclosed separately.
After the included 60-day hypercare, customers may separately subscribe to ERP Support and Maintenance. Outstanding project obligations remain governed by the signed agreement and do not automatically become paid AMC work when hypercare ends. AMC covers the contracted software support functions and agreed response window, not recurring interpretation of yields, profitability or management decisions. Such financial/performance advisory work belongs to a distinct engagement, including Virtual CFO where suitable.
YOUR PARTNER IN GROWTH
Tell us about your business and the scope you need.